The County Commissioners tabled the resolution. No adoption date has been set. No signatures can be collected until the resolution is adopted and a true copy of the petition is filed.
Company DossierCompiled 2 September 202623 primary sources · 126 inline citations
An Australian-incorporated, Sydney-headquartered operator of grid-connected data centers, mid-way through converting a 23 EH/s bitcoin mining fleet into a vertically integrated AI cloud platform spanning four countries and roughly 5.6 gigawatts of announced power. This file covers the corporate record, the board, the site portfolio, six years of results, and a line-by-line test of the $9.7bn Microsoft contract against the executed agreement.
Incorporation
Australia
Listed since
17 Nov 2021
SEC CIK
0001878848
Fiscal year end
30 June
Employees
685
Announced power
5,610 MW
Publication statement
Published by
Brian West
Author's position
IREN does not need our tax incentives to build and operate.
Company invited to comment
IREN was not invited to comment before publication.
Basis
Public SEC filings, company disclosures and the Delaware, Oklahoma and British Columbia corporate registries, cited throughout. No non-public information was received or relied upon.
Data cut-off
2 September 2026 · FY2026 proxy not yet filed
Who pays for this
Nobody. This site runs on a server the author pays for. No
organisation funds the work and no one is paid to do it. Costs so far are a domain, server
capacity, certified copies from the Secretary of State, postage, and the fees public bodies charge
for records — $248.50 to date, itemised on
the records page with the invoice or receipt behind every line. That figure
will grow as the remaining 9 requests go out. If the funding position
ever changes it will be said here.
Corrections
brian@mcalester.net · errors of fact will be corrected and the correction noted
Market
What the market says today
live · not part of the cut-off
Every figure in the rest of this file is fixed at the 2 September 2026 cut-off and tied to a
filing. This one is not. It is a live quote from Nasdaq, the exchange IREN lists on, and it moves while you read
it. It is here because no filing can stay current on the number the market revises continuously: what it thinks
the whole company is worth today.
IRENNASDAQ-GS
$27.73+0.74+2.74%
At the closeOct 19, 2026 4:00 PM ET
Pre-market$26.71−1.02−3.68%Oct 20, 2026 6:47 AM ET
Oct 2025−53.2% in 12 monthsOct 2026
Market capitalisation
$10.81bn
Previous close
$27.73
Shares traded today
858,046vs 43.60m average
Analyst 1-year target (consensus)
$80.00
Day range
—
52-week range (−63.9% from the high)
$26.55 – $76.87
IREN is listed on Nasdaq, but its public quote feed has not answered.
See the quote on Nasdaq.
Live
market data comes from Nasdaq,
the listing venue's own public feed, cached for up to five minutes and refreshed while this page is open.
Prices are not part of the sourced record below and were not used in compiling it. Nothing here is investment advice.
01 / Business
What the company actually does
FY26 · year ended 30 Jun 2026
IREN describes itself as a vertically integrated AI Cloud Services platform that owns all three layers of the stack: the data center layer (land, power, substations, buildings, cooling), the compute layer (GPUs, CPUs, storage, servers, networking), and the software layer (managed services and enterprise support, acquired wholesale with Mirantis in August 2026).1
The distinguishing structural choice is grid-connected power rather than behind-the-meter generation. IREN buys land and secures transmission interconnection directly — regulated tariffs from BC Hydro in British Columbia and Public Service Company of Oklahoma in Oklahoma, wholesale market exposure through ERCOT in Texas — and builds the substations itself. Every operating site has run on 100% renewable energy since commencement, roughly 98% from clean generation in British Columbia with the balance covered by renewable energy certificates.1
The company is simultaneously exiting the business that built it. As of 30 June 2026 installed bitcoin mining capacity was 23.2 EH/s occupying about 380 MW, against just 40 MW of operating AI cloud capacity. IREN began decommissioning miners during FY26 and aims to substantially complete the transition by 31 December 2026. It liquidates mined bitcoin daily and held none on its balance sheet at year end.1
707.0mTotal revenue FY26 USD · from $501.0m in FY25
128.8mAI Cloud revenue FY26 ≈8× the $16.4m booked in FY25
(702.6)mNet loss FY26 incl. $638.8m non-cash impairment
245.7mAdjusted EBITDA FY26 non-GAAP · $269.7m in FY25
5.90bnCash & equivalents plus $1.72bn restricted cash
Revenue mix and results, US$ millions, per the FY26 Form 10-K and results release14
Line
Q4 FY26
Q3 FY26
FY26
FY25
AI Cloud Services revenue
70.5
33.6
128.8
16.4
Bitcoin mining revenue
66.7
111.2
578.2
484.6
Total revenue
137.2
144.8
707.0
501.0
Net income (loss)
(684.0)
(247.8)
(702.6)
86.9
Adjusted EBITDA non-GAAP
19.2
59.5
245.7
269.7
Note The FY26 loss is dominated by impairments on decommissioned mining hardware — $450.4m of the $638.8m full-year charge landed in Q4 alone — not by operating deterioration. Q4 Adjusted EBITDA also fell on hiring and platform investment running ahead of the AI revenue ramp.14
02 / Sites
The 5.6 GW portfolio, site by site
as of 30 Jun 2026
Nine announced data center projects across four countries, plus what the company calls a further multi-gigawatt development pipeline it has not yet named. Bars are scaled against the largest site, Kiowa at 1,600 MW gross.119
OperatingUnder constructionIn developmentPlanned
Canada · British Columbia3 sites · 160 MW
Canal FlatsBritish Columbia
30MW
Operating
Prince GeorgeBritish Columbia
50MW
Operating
MackenzieBritish Columbia
80MW
Operating
United States · Texas & Oklahoma4 sites · 4,350 MW
ChildressTexas · ERCOT
750MW
Operating
Sweetwater 1Texas · ERCOT
1,400MW
Construction
Sweetwater 2Texas · ERCOT
600MW
Construction
KiowaOklahoma · PSO
1,600MW
Development
Spain · Extremadura1 site · 300 MW
BadajozExtremadura
300MW
Development
Australia · South Australia1 site · 800 MW
BundeySouth Australia
800MW
Planned
Total announced9 sites · 5,610 MW
Site notes
Childress is the AI beachhead. It hosts the four "Horizon" liquid-cooled halls built for Microsoft, each 50 MW of critical IT load. Horizon 1 was delivered and accepted in August 2026; Horizon 2 is commissioning and Horizons 3–4 are in late-stage construction, targeting Q4 2026.
Sweetwater is the largest build. Substation energization for Sweetwater 1 targeted April 2026; Sweetwater 2 targets late 2027.
Badajoz arrived with the June 2026 acquisition of Nostrum Group (Ingenostrum, S.L.) and marks IREN's entry into Europe, along with local development, engineering and construction capability.
New liquid-cooled deployments are planned at Mackenzie, Canal Flats and Prince George during 2027 to use power headroom already secured at the operating British Columbia sites.
Delivery targets are cumulative 0.3 GW IT in 2026 and 0.8 GW IT in 2027 — a reminder that gross site megawatts and sellable IT load are different units.4
03 / Footprint
Where the company is registered, and where it isn't
Corporate identity, per the FY26 Form 10-K cover, Exhibit 4.1 and EDGAR submissions data1317
Attribute
Record
Legal name
IREN Limited
Former names
Iris Energy Ltd (Sep 2021 – Nov 2024) · Iris Energy Pty Ltd (to Oct 2021)
Place of incorporation
Australia — ACN 629 842 799 (SEC country code C3)
Registered & principal office
Level 5, 55 Market Street, Sydney NSW 2000, Australia
Telephone
+61 2 7906 8301
Listing
Nasdaq Global Select Market, "IREN", since 17 November 2021
Commission file
001-41072 · CIK 0001878848 · SIC 6199
Filer status
Large accelerated filer; converted from foreign private issuer forms (20-F/6-K) to domestic forms (10-K/8-K) during 2025
Shares outstanding
394,058,648 Ordinary shares and 2 B Class shares, as of 14 August 2026
Non-affiliate market value
≈$11.9 billion at 31 December 2025
Auditor
KPMG LLP from 27 November 2025; previously Raymond Chabot Grant Thornton LLP (May 2023 – Nov 2025)
Significant subsidiaries
Exhibit 21.1 to the FY26 10-K lists seven significant subsidiaries. The structure is compact and jurisdictionally uniform: every US entity is a Delaware corporation or LLC, and every Canadian entity is British Columbian — Delaware being the conventional domicile for US subsidiaries irrespective of where operations sit. The naming convention encodes function: Holdings for asset-owning vehicles, Hardware for the GPU-financing entities that carry the non-recourse debt.2
The seven significant subsidiaries, as Exhibit 21.1 lists them and as the Delaware and British Columbia registries record them22123
Entity
Jurisdiction
Registry number
Formed
Registered agent
IE US Holdings Inc.
Delaware, United States
6066236
8 Jul 2021
Corporation Service Company, 251 Little Falls Drive, Wilmington
IE US Development Holdings 3 Inc.
Delaware, United States
6401015
16 Nov 2021
Corporation Service Company, 251 Little Falls Drive, Wilmington
IE US Hardware 1 Inc.
Delaware, United States
6579372
14 Jan 2022
Corporation Service Company, 251 Little Falls Drive, Wilmington
IE US Hardware 3 LLC
Delaware, United States
6666496
10 Mar 2022
Corporation Service Company, 251 Little Falls Drive, Wilmington
IE US Hardware 3 Holdings LLC
Delaware, United States
10520910
23 Feb 2026
Corporation Service Company, 251 Little Falls Drive, Wilmington
IE CA 5 Holdings Ltd.
British Columbia, Canada
BC1310638 · business number 793440603
16 Jun 2021
Not published by OrgBook · status active
IE CA Leasing Ltd.
British Columbia, Canada
BC1446682
27 Oct 2023
Not published by OrgBook · status active
The registers hold more of the family than the exhibit does. A Delaware name search for "IE US" returns eighteen entities, sixteen of them following the IE US pattern; Exhibit 21.1 vouches for five. The other eleven — Development Holdings 1, 4, 5, 6, 7 and 8, Hardware 4, 5 and 6, IE US Operations Inc. and IE US 1, Inc. — are name matches only, and three of them, Hardware 5 LLC, Hardware 6 LLC and Development Holdings 8 LLC, were formed on 28 May and 1 June 2026, after the Kiowa Project Plan had been recommended.21 British Columbia has a neighbour of the same kind: IE CA Development Holdings 5 Ltd., BC1307619, registered 28 May 2021 and absent from the exhibit.23
Two further wholly owned subsidiaries were added by acquisition after the subsidiary list's cut-off: Mirantis, Inc. (August 2026) and Ingenostrum, S.L., trading as Nostrum Group (June 2026, Spain).1
Emerald ProjectCo Inc.: the Oklahoma counterparty, as the registries record it
The Pittsburg County Project Plan names Emerald ProjectCo Inc. as the company behind the Kiowa data center. That name is not in Exhibit 21.1 and appears nowhere in IREN's SEC record. The two state registries that do hold it record the following, and nothing more.2122
Emerald ProjectCo Inc. — every field on the record; Delaware from a snapshot dated 24 July 2026, Oklahoma from the live record and the certified filings of 4 September 20262122
Attribute
Delaware (home state)
Oklahoma (foreign registration)
Legal name
EMERALD PROJECTCO INC.
EMERALD PROJECTCO INC. · name type: Legal Name
File / filing number
10276559
2313901183
Entity type
Corporation, domestic
Foreign For Profit Business Corporation · jurisdiction: Delaware, USA
Formed / qualified
Incorporated 29 July 2025; certified in good standing 2 December 2025
Certificate of Qualification filed and effective 16 December 2025 (document 74120930002); Certificate of Authority the same day · Qualified: Yes
Status
Not in the snapshot
In Existence; Certificate of Good Standing issued 4 September 2026
Principal place of business
—
620 FM 1033, Childress, TX 79201: IREN's Childress data center campus
Stated Oklahoma business
—
"project development and land acquisitions"
Officers
None recorded
Will Roberts, President; Jason Date, Secretary (qualification, 16 December 2025); William Roberts signed the agent appointment
Capital
—
1,000 common voting shares at $0.01 par; total authorised capital $10; assets $21,100 and liabilities $1,000 at qualification; maximum investment in Oklahoma declared for the current fiscal year $187,000,000
Registered agent
Corporation Service Company
The Secretary of State, 2300 N Lincoln Blvd, named on the qualification form; Corporation Service Company appointed 30 July 2026 (document 77756320002)
Registered address
251 Little Falls Drive, Wilmington, DE 19808
10300 Greenbriar Place, Oklahoma City, OK 73105
Shareholder, parent or subsidiaries
None recorded
None recorded
Former or trade names
None recorded
None recorded
Filing history
Not in the snapshot
Certificate of Qualification, 16 December 2025; Appointment of Registered Agent, 30 July 2026: the complete file, per the certified-copies certificate, published on the comparison page
Three things follow, and one does not. The domicile fits: every US entity in Exhibit 21.1 is a Delaware corporation or LLC, and so is this one. The date fits: incorporation on 29 July 2025 precedes the county's Statutory Review Committee recommendation of 21 April 2026 by almost nine months. The agent matches: Emerald ProjectCo and all five Delaware entities in Exhibit 21.1 sit with Corporation Service Company at 251 Little Falls Drive — but that is a commercial agent used by a great many unrelated companies from that address, and a shared agent proves nothing on its own.21The officer and the address close the loop: the certified Oklahoma qualification of 16 December 2025 is signed by Will Roberts as President, the name of this company's co-founder and co-chief executive, and gives the corporation's principal place of business as 620 FM 1033, Childress, Texas, which is IREN's Childress campus.22 The same filing shows what the vehicle is: 1,000 shares at a cent, ten dollars of authorised capital, $21,100 of assets against $1,000 of liabilities, a stated Oklahoma business of "project development and land acquisitions," and a declared maximum of $187,000,000 to be invested in the state in the current fiscal year. The Secretary of State was written in as its registered agent on the form; Corporation Service Company replaced it on 30 July 2026 over William Roberts's signature. What still does not follow is ownership: no record read names the shareholder, the name departs from the IE US convention every other US subsidiary follows, and Exhibit 21.1 does not list it. The relationship is documented by officer and address; the parent is not stated in any document in this file.
People, and where they sit
Headcount was 685 employees at 30 June 2026 — nearly tripled during FY26, including more than 60 who arrived with Nostrum. The Mirantis acquisition added roughly 580 more in August 2026, taking the group past 1,250. Separately, about 3,000 personnel including contractors and subcontractors were engaged across the US sites at year end. No employees are unionised.
The asset base tells the geographic story more honestly than the head office does: 72% of non-current assets sit in the United States and 24% in Canada, while the registered office, the executive filing address and the fiscal calendar are all Australian.1
Officer locations: what the record actually supports
Every Section 16 insider — both Roberts brothers, Bartholomew, Alfred, Guzowski, Parasuraman, Lewis and Nucifora — files Forms 3, 4 and 144 from the same c/o address at 55 Market Street, Sydney. No individual residential address appears in any IREN filing, and none is required to.13
Individual locations are stated publicly for only two people: David Bartholomew is described as Australia-based, and Chris Parker was announced as Sydney-based on appointment.520 Anything further would be inference rather than record.
Four independent non-executives and the two founder Co-CEOs. All four independents sit on both standing committees; there is no standing nominating committee, and the independent directors collectively recommend nominees. Following constitutional amendments approved at the November 2025 AGM, directors now stand for election at every annual general meeting.59
David Bartholomew
Independent Non-Executive Chair
Age
64
Joined
2021
Held
136,064 ordinary shares (<1%)
Based
Australia
Compensation — ChairAudit & RiskFinancial expert
An Australian infrastructure and energy executive. Former Chief Executive Officer of DUET Group, where he oversaw the transition to internalised management. Earlier career spans Boston Consulting Group, BHP Minerals, Hastings Funds Management and Lend Lease.
Board seats have included Vector Limited and the Power and Water Corporation of the Northern Territory, alongside a range of energy entities. Bachelor of Economics (Honours), Adelaide University; MBA, Australian Graduate School of Management.
Daniel Roberts
Co-Founder · Co-Chief Executive Officer · Executive Director
Age
41
Joined
2018
Held
6,251,247 ordinary (2.3%) + 1 B Class
Votes
21.8% of total voting power
Not independentBrother of Will Roberts
Twenty years in finance, infrastructure and renewables. Previously an Executive Director and the second-largest individual shareholder at Palisade Investment Partners, a specialist infrastructure fund manager, after earlier roles at Macquarie Group and PricewaterhouseCoopers in London and Sydney.
Sits on the board of JOLT, the BlackRock-backed EV charging business, again as second-largest individual shareholder. Former directorships include Northern Territory Airports, Sunshine Coast Airport, Granville Harbour Wind Farm, Ross River Solar Farm, ANZ Terminals and the Tasmanian Gas Pipeline. Bachelor of Business, UTS; Master of Finance (Dean's List), INSEAD.
His shares are held through Awassi Capital Holdings 2 Pty Ltd as trustee for The Awassi Capital Trust #2.
Will Roberts
Co-Founder · Co-Chief Executive Officer · Executive Director
Age
35
Joined
2018
Held
6,251,247 ordinary (2.3%) + 1 B Class
Votes
21.8% of total voting power
Not independentBrother of Daniel Roberts
Fourteen years in finance, real assets and commodities markets, covering debt financing, principal investment in resources projects and foreign exchange and commodity price risk management. Worked in accounting and banking, resources, commodities and real assets at Macquarie Group, Westpac and Brookfield Multiplex, and co-founded Macquarie's Digital Assets team.
Bachelor of Business (Distinction), UTS. Shares held through Awassi Capital Holdings 1 Pty Ltd as trustee for The Awassi Capital Trust #1.
Sunita Parasuraman
Independent Non-Executive Director
Age
52
Joined
Jul 2023
Held
30,866 ordinary shares (<1%)
Audit & Risk — ChairCompensationFinancial expert
A technology executive who built teams at Meta, VMware, Genentech and Apple. Most recently Head of Investments and New Product Experimentation at Meta, and before that Global Head of Treasury — where she also led Facebook's blockchain initiative, Libra.
Serves on the board of The Baldwin Group (Nasdaq: BWIN), on its Audit and Technology & Cyber Risk committees, and chairs the Nomination & Governance Committee of the IIT Bombay Heritage Foundation. BEng, IIT Bombay; MEng, University of Pennsylvania; MBA, Berkeley Haas. The only director to hold no board options.
Michael Alfred
Independent Non-Executive Director
Age
44
Joined
Oct 2021
Held
841,753 ordinary shares (<1%)
Audit & RiskCompensation
A private investor and serial founder. Runs Alpine Fox LP, focused on value equities and bitcoin. Co-founded Digital Assets Data Inc. in January 2018 and served as CEO until its sale to New York Digital Investment Group in November 2020. Previously Managing Director and executive committee member at Strategic Insight (acquired by ISS in 2019), CEO of BrightScope (acquired October 2016), and co-founder of Alfred Capital Management.
Current boards: Crestone Group, Eaglebrook Advisors and Wealthie. BA in History, Stanford University. NYDIG, which bought Digital Assets Data in 2020, was separately the lender in the 2023 receivership of two IREN non-recourse subsidiaries, settled in August 2025. The Board has determined Mr Alfred independent under Nasdaq rules, and the proxy discloses no related-party transaction involving any director since July 2024.5
Chris Guzowski
Independent Non-Executive Director
Age
40
Joined
Dec 2019
Held
57,351 ordinary shares (<1%)
Audit & RiskCompensation
Fifteen years developing renewable energy projects across Europe and Australia. Founded Baltic Wind, which develops large-scale European wind projects, and Mithra Energy, covering Polish wind, solar and battery storage. Previously Project Development Director for Photon Energy's Australian solar portfolio.
Founding director of ADCCA and co-founder of ABA Technology in 2014; an active angel investor in technology startups. Career began at PricewaterhouseCoopers. Bachelor of Business, UTS; MBA in Energy Management, Vienna University of Economics and Business.
05 / Control
Two unregistered shares hold 43.5% of the vote
The most consequential governance fact about IREN is not in the ownership percentages. It is in the two B Class shares, held by the Roberts brothers' family trusts.
Under the constitution, each holder of a B Class share is entitled to 15 votes per Ordinary share held by that holder. B Class shares carry no dividend rights and are unregistered. They must be redeemed on the earliest of: the holder ceasing to be a director through voluntary retirement, a transfer in breach of the constitution, liquidation, or 17 November 2033 — twelve years after listing.
The practical effect: Daniel and Will Roberts each hold 2.3% of ordinary shares but 21.8% of total voting power. Directors and executive officers together held 4.6% of the ordinary shares and 43.5% of the vote. Constitutional amendments require 75% of votes cast.35
Beneficial ownership as of 31 August 2025, against 271,980,494 ordinary shares then outstanding5
Holder
Ordinary shares
% ordinary
B Class
% total vote
Daniel Roberts
6,251,247
2.3%
1
21.8%
William Roberts
6,251,247
2.3%
1
21.8%
Michael Alfred
841,753
<1%
—
<1%
David Bartholomew
136,064
<1%
—
<1%
Belinda Nucifora former CFO
94,164
<1%
—
<1%
Chris Guzowski
57,351
<1%
—
<1%
Sunita Parasuraman
30,866
<1%
—
<1%
Directors and executive officers as a group
13,662,692
4.6%
2
43.5%
No holder of more than 5% of ordinary shares was reported in that proxy. Subsequent Schedule 13G filings are all passive institutional positions: Goldman Sachs Group and Bank of America (both filed August 2026), Susquehanna Securities, Jane Street Group, Citadel Securities, and HANSAINVEST of Hamburg. A single Schedule 13D exists, filed December 2022 by Everest Hill Group Inc. of Road Town, Tortola, BVI, and amended in September 2023.18
On 30 June 2026 the board granted each Co-CEO 9,099,328 restricted stock units — vesting in four equal annual instalments, each tranche then locked by a two-year post-vesting holding period running to fiscal 2033. In exchange, neither Co-CEO receives a further equity grant until fiscal 2031. The independent directors approved the grants unanimously with an independent compensation consultant. The 2025 Omnibus Incentive Plan under which they were made drew the heaviest opposition of any AGM item: 29.3 million votes against, against 214.9 million for.910
06 / Leadership
An executive team rebuilt in eighteen months
Five C-suite appointments landed in 2026 alone, most of them hired out of hyperscalers and infrastructure operators rather than promoted from the mining business. The Chief Marketing Officer arrived through an acquisition of his own agency.
Anthony Lewis, 49, became CFO on 8 September 2025 after ten weeks as Chief Capital Officer. He spent 2021–2024 as Co-Treasurer of Macquarie Group and before that led Capital and co-led Transactions and Structure within Group Treasury. Bachelor of Commerce and Bachelor of Laws (First Class Honours), University of Sydney. Belinda Nucifora, 52, ceased employment as CFO the same day.125
Eric Hammersley's background is the most unusual on the list: before Nutanix and NVIDIA he held senior engineering posts in the US federal government and defence sector, including Chief Engineer supporting the Joint Chiefs of Staff.20
07 / Pay
What management is paid, and what they have disposed of
FY2025 proxy · Section 16 filings
Co-CEO compensation rose roughly elevenfold in a single year. In FY2025 the two brothers were awarded $72,647,744 each — identical packages — against full-year net income of $86.9m. Their combined pay was 167% of the company's only profitable year's earnings.
Summary Compensation Table, named executive officers, US$5
Officer
FY
Salary
Stock awards
Incentive
Total
Daniel Roberts Co-CEO
2025
964,350
69,695,744
1,968,000
72,647,744
Will Roberts Co-CEO
2025
964,350
69,695,744
1,968,000
72,647,744
Each Co-CEO
2024
1,595,849
3,800,010
1,258,500
6,672,353
Each Co-CEO
2023
2,426,711
3,800,000
529,229
6,772,876
Belinda Nucifora former CFO
2025
303,363
1,611,511
387,216
2,321,407
Salary actually fell — the increase is almost entirely equity. Note also that every equity award outstanding at 30 June 2025 — 29,604,388 securities issuable at a weighted-average exercise price of $47.07, with 9,870,552 remaining available — sat under plans that had not been put to a shareholder vote. That was lawful: as a foreign private issuer, IREN elected to follow Australian home-country practice in lieu of Nasdaq's shareholder-approval requirement for equity plans, and said so in its filings.14 The 2025 Omnibus Incentive Plan, approved that November after the move to domestic-filer status, was the first to go to a vote — and drew 29.3 million votes against.59
Then, in June 2026, another 18.2 million shares
The board granted each Co-CEO 9,099,328 RSUs on 30 June 2026 — together 18,198,656 shares, about 4.6% of shares outstanding. Four-year vesting, each tranche locked by a further two-year holding period running to fiscal 2033, and no further equity grant to either until fiscal 2031. The 8-K disclosed no grant-date fair value. As an illustrative calculation only — the author's, not the company's — at $36.32, the last ordinary-share price recorded in any Form 4 (a director's open-market sale on 16 September 2025, reported late in a Form 4 filed 1 July 2026), the two grants together would be worth roughly $661m before any discount for vesting and holding restrictions. That price is nine months older than the grant and is used here only because no share price closer to the grant date appears in a filed document; it is not a grant-date valuation. The audited figure will appear in the FY2026 proxy, not yet filed.1013
Non-employee director pay is modest by comparison
Director compensation, FY2025, US$ — programme: $60,000 base retainer, Chair +$60,000, Audit chair +$20,000, plus DRSUs5
Director
Cash
Stock
Other
Total
David Bartholomew Chair
112,780
202,509
7,220
322,509
Michael Alfred
110,000
135,006
—
245,006
Sunita Parasuraman Audit chair
80,000
135,006
—
215,006
Chris Guzowski
60,000
135,006
—
195,006
Section 16 dealings, September 2025
Two separate disposals by each Co-CEO, in different classes of security. On 3 and 4 September 2025, each disposed of 1,000,000 stock options — reported on the derivative table — at $25.49 and $23.51. Those options carried an exercise price of AUD $5.005 and were due to expire on 20 December 2025. Separately, on 11 September, each sold 1,000,000 ordinary shares at $33.131, about $33.1m each.13
The option disposals have an evident and timing-independent explanation on the face of the filing: the options were within about fifteen weeks of expiry and would otherwise have lapsed. The Form 4s do not mark either disposal as made under a Rule 10b5-1 trading plan — the checkbox is unticked — and all were preceded by Form 144 notices and reported on Form 4 in the ordinary course. Nothing in the public record characterises any of these transactions as irregular, and this file makes no suggestion that they were.13
Other Section 16 activity is routine: grants on 1 July 2025 and 1 July 2026, and a single director sale of 11,958 ordinary shares at $36.32 on 16 September 2025 — reported in a Form 4 not filed until 1 July 2026, some nine and a half months later. The only ordinary share prices in this file that come from a filed document rather than a market feed are $33.131 (11 September 2025) and $36.32 (16 September 2025); the $23.51 and $25.49 figures are option disposal prices and are not share prices.13
08 / Contracts
Customers, capital and counterparty risk
IREN's revenue base flipped from one anonymous counterparty — the bitcoin network — to a handful of very large, very identifiable ones. The company acknowledges the concentration directly in its risk factors.
Five-year average term through 2031; four Horizon tranches at Childress; 20% of each tranche prepaid
NVIDIA
May 2026
≈$3.4bn
Five-year contract for NVIDIA's own AI and research workloads
Prometheus, Perplexity, Together AI
Jul 2026
≈$2.8bn
Multi-year contracts, aggregate value
Undisclosed frontier AI lab
Aug 2026
not disclosed
Multi-year cloud services contract
Cohere, Figure AI, Fal AI, Higgsfield AI
2026
not disclosed
Named among recent signings and expansions
Reported annualised run-rate revenue stands at $4bn contracted for 2026 capacity, of which $1bn was operating as of 26 August 2026. ARR is an operating metric, not GAAP revenue, and IREN says so explicitly. 2026 capacity is described as largely sold out; 2027 is in late-stage discussions. Recent three-year contracts price above $20m of revenue per MW of IT load, which IREN says represents “a ~2 year payback”, with active discussions at about $25m per MW. The payback is the company’s own figure and its footnote confines it to the equipment: “estimated capital expenditure for GPUs and ancillaries divided by contracted revenue less estimated direct costs”, not the data centers that house them.4
The offsetting obligation: $5.8bn to Dell, guaranteed by the parent
Signed the same day as the Microsoft agreement, 2 November 2025. Dell Marketing L.P. supplies the GPUs and ancillary equipment for the Horizon deployment in tranches from March 2026, for an aggregate purchase price of approximately $5.8 billion, payable within 30 days of each tranche shipping. Critically, and unlike the GPU financing: IREN Limited has agreed to unconditionally guarantee IE US Hardware 3's obligations under it. This is direct parent recourse, and it is the liability sitting opposite the $9.7bn of Microsoft revenue. The two documents should always be read together.8
The NVIDIA relationship, three ways
NVIDIA is simultaneously IREN's chip supplier, a cloud customer, a certifying body and a prospective shareholder. Under the May 2026 strategic partnership, NVIDIA holds the right to invest up to $2.1 billion in ordinary shares, contingent on delivery of up to 600,000 GPUs and regulatory conditions, supporting up to 5 GW of DSX-aligned infrastructure. IREN is an NVIDIA Cloud Partner, secured Preferred Partner status in FY26, and holds Exemplar Cloud status for HGX B300 and GB300 NVL72 — the latter awarded after NVIDIA tested the Horizon 1 deployment at Childress in August 2026.1
How the buildout is funded
$3.6bn investment-grade GPU financing (May 2026) at a 6.0% weighted average rate against the Microsoft contract. With prepayments, it funds 96% of the associated GPU capex.
$2.8bn of new GPU financings for non-investment-grade customer deployments, including $2.4bn led by Blue Owl and PIMCO at a 9.0% fixed rate for the Mackenzie air-cooled expansion — covering 90% of that GPU capex.
Customer prepayments now represent 45–55% of GPU capex on recent contracts.
Total cash plus committed GPU financing and prepayments: $14bn.4
Acquisitions
Mirantis, Inc. — completed 4 August 2026 for approximately $544m: 12.6 million ordinary shares plus cash and roughly $40m in RSUs. Brings the k0rdent AI platform, 1,500+ enterprise customers and about 580 people. This is the software layer.
Nostrum Group (Ingenostrum, S.L.) — completed June 2026: 837,424 ordinary shares plus approximately €82m cash. Spanish grid-connected data center developer; brought the Badajoz site and European development capability.
Awaken — May 2026. A creative and media agency; its founder Chris Parker became IREN's first global CMO, with media operations spun out.20
09 / Verification
Is the $9.7bn real? Tracing it to the signed contract
A headline contract value is only as good as the document behind it. This one has the document: the executed agreement is on the public record, and the number in it survives every cross-check available.
The Partner Statement of Work between Microsoft Corporation and IE US Hardware 3 Inc. was filed in full as Exhibit 10.3 to IREN's Form 10-Q for the quarter ended 31 December 2025. It carries the signature of Scott Guthrie, EVP Cloud + AI, dated 31 October 2025, countersigned by Kent Draper as authorized signatory and William Roberts as director on 2 November 2025.67
Section 3.2 and Table 1 of the executed SOW — figures as they appear in the filed document7
Contract term
Amount (USD)
Total contract value cap — "Service Fees will not exceed"
9,666,845,337.60
Aggregate Tranche Value (Horizon 1–4)
9,664,199,424.00
Aggregate Upfront Payment = 20.00% exactly
1,932,839,884.80
Estimated monthly payment, months 1–24
161,180,236.80
Estimated monthly payment, month 25 → Service End
107,199,838.11
The contract's own arithmetic closes
Rebuild the total from the payment schedule: 24 months at $161,180,236.80, then 36 months at $107,199,838.11, plus the upfront, gives $9,660,359,740 — within 0.07% of the stated cap. The monthly step-down of $53,980,398.69 multiplied across the final 36 months returns $1.943bn, within half a percent of the $1,932,839,884.80 upfront — the upfront being credited back pro rata after month 24, exactly the mechanism described in the 8-K. Every figure in the reconstruction is taken from the executed schedule, and the two independent routes to the total agree to within a tenth of a percent.78
What is redacted, and what isn't
83 passages are marked [***] under the standard that the information "is not material and/or contains personal information." The redactions cover per-tranche values, GPU quantities, delivery dates, the price per GPU-hour, and site addresses. The aggregate economics — the numbers above — are not redacted. So the total is verifiable while the unit pricing is not.7
The hardest corroboration: Microsoft's cash is already on the balance sheet
Note 20 discloses $1,623,480 thousand of deferred lease revenue — advance payments received on capacity tranches that had not commenced as of 30 June 2026. Against a contractual aggregate upfront of $1,932,839,884.80, that is 84% of the prepayment already received in cash, before a single tranche started earning.
One honest caveat: that line item may include prepayments from other lease-classified customers, so 84% is an upper bound on the share attributable to Microsoft. The direction is not in doubt — over $1.6bn of customer money has actually been wired.17
And the audited aggregate reconciles
The FY26 accounts disclose $5.1bn of unsatisfied remaining performance obligations under ASC 606 plus $11.4bn of aggregate contracted lease value under ASC 842 — $16.6bn in total. Announced contracts sum to roughly $15.9bn (Microsoft $9.7bn, NVIDIA $3.4bn, the July trio $2.8bn) with several undisclosed deals on top. The public numbers and the audited number agree.148
Why Microsoft sits outside the RPO figure
An accounting point worth understanding before comparing IREN to peers. IREN determined that its GPU capacity contracts contain leases — of specified GPU equipment and dedicated data center space — and accounts for them as operating leases with itself as lessor under ASC 842. That places the Microsoft value in the $11.4bn lease bucket rather than in the $5.1bn ASC 606 RPO. Anyone reading RPO alone as "the backlog" will understate it by roughly two-thirds.1
The caveat that matters most: none of it is revenue yet
The accounts state plainly that "No lease revenue was recognized during the periods presented", and that all FY26 AI Cloud Services revenue was generated in Canada. Microsoft contributed zero to the $128.8m of FY26 AI Cloud revenue — that figure comes entirely from the older British Columbia deployments.
Revenue begins only on customer acceptance. Horizon 1 was accepted in August 2026, which falls in FY27. Of the ASC 606 RPO, only $0.9bn is expected to be recognized in the twelve months to 30 June 2027 and $1.3bn in the year after.1
Verdict: the $9.7bn is real as an executed contract and substantially real as cash in the bank. It is not yet real as revenue, and the gap between those two states is where the execution risk lives.
10 / Position
The business does not fund its own expansion
FY26 · US$ millions
IREN is solvent, unlevered on a net basis and in no near-term danger. But the buildout is financed by issuing paper, not by operations, and the headline operating cash flow does not mean what it appears to mean.
— of which increase in deferred revenue (customer prepayments)
1,841.7
Operating cash flow excluding prepayments
258.8
Payments for property, plant and equipment
(2,998.0)
Payments for computer hardware (GPUs)
(1,335.1)
Net cash used in investing activities
(4,723.0)
Proceeds from issuance of Ordinary shares
4,742.8
Proceeds from convertible notes
6,299.6
Net cash from financing activities
9,680.1
That $2.1bn operating inflow is 88% customer prepayments — a liability that must be worked off by delivering service, not earned margin. Strip it out and the business generated $259m of operating cash against $4.72bn of capex. Free cash flow was −$2.62bn as reported and −$4.46bn underlying. The gap was closed by raising $11.0bn of equity and convertible notes in twelve months, roughly 43× the underlying operating cash flow.1
13.81bnCapital commitments from $368.8m a year earlier — 37×
5.90bnUnrestricted cash a further $1.72bn is ring-fenced in the financing SPV
5.21bnCoverage shortfall vs unrestricted cash + $2.71bn undrawn, before future prepayments
3.50bnRemaining ATM capacity $6.0bn shelf less ~$2.5bn issued
On the looser reading — counting restricted cash — the gap is $3.48bn against $3.50bn of remaining ATM capacity, which line up almost exactly. On the stricter reading below, the gap is wider. Either way the arithmetic says the buildout is planned to be closed with further equity issuance.1
Correction to the obvious reading: $1.72bn of that cash is not the group's to spend
Note 26 consolidates a variable interest entity — IE US Hardware 3, LLC, the GPU financing subsidiary. Essentially all of the restricted cash sits inside it, along with the assets the Microsoft deployment runs on:
Restricted cash $1,670.3m current + $53.7m non-current — the whole restricted balance
Property and equipment, net $1,487.1m, pledged as collateral
Deferred revenue $1,013.1m — a large share of the Microsoft prepayment
Accounts payable and accrued $1,127.7m; debt $918.2m
These assets "may be used only to settle obligations of IE US Hardware 3, LLC and are not available to satisfy claims of the general creditors of IREN Limited or any of its other subsidiaries" until the facility is repaid. So the group's genuinely unrestricted cash is $5,895.6m, not $7,619.5m — and the coverage shortfall against $13.81bn of commitments is nearer $5.2bn than the $3.5bn a simple reading gives. The structure cuts both ways: the SPV's debt is non-recourse, so the ring-fence protects the parent as well as constraining it.1
Where the assets actually are
Property, plant and equipment, gross, US$ thousands1
Class
30 Jun 2026
30 Jun 2025
Construction in progress
3,657,072
237,734
GPU hardware
2,034,811
76,001
Buildings
864,255
639,750
Mining hardware
596,988
1,135,584
Right-of-use assets — finance lease
301,848
—
Land
139,074
13,086
Other
69,269
10,045
Gross, before depreciation and impairment
7,663,316
2,112,200
Construction in progress grew fifteenfold to $3.66bn — more than half the gross asset base is not yet earning. Mining hardware fell by nearly half as it was decommissioned. Accumulated impairment stands at $484.5m. GPUs are depreciated straight-line over an estimated five-year life, which is the single most consequential accounting judgment in these accounts: the company has just written off $638.8m of the previous hardware generation, and the FY26 fleet is being depreciated on the same kind of estimate.1
Two things a headline reading misses
First, the FY26 loss would have been materially worse without $558.5m of unrealized gains on financial instruments — chiefly fair-value movements on the company's own capped call and prepaid forward transactions. That is a derivative gain on IREN's own share price, not operating performance. Strip it out and the pre-tax loss approaches $1.27bn.
Second, the loss is entirely offshore. Income before tax splits +$210.2m in Australia against −$918.8m foreign. The Australian parent is profitable; the US and Canadian operations carry the losses, which is why the valuation allowance against foreign deferred tax assets jumped to $209.4m.1
Dilution overhang
Potentially dilutive securities excluded from FY26 diluted EPS as anti-dilutive, weighted average1
Instrument
Shares
Convertible notes
71,831,847
Capped call transactions offsetting
32,114,455
Restricted stock units
23,250,808
Prepaid forward transactions offsetting
8,910,354
Stock options
5,504,194
Investment Rights NVIDIA
4,520,548
Total
146,132,206
Against 394.1m shares outstanding, the genuinely dilutive instruments — converts, RSUs, options and the NVIDIA investment rights — total 105.1m shares, a 27% overhang on top of the 53% dilution already taken. The capped calls and prepaid forwards work the other way, which is what IREN spent $448.9m buying. Basic and diluted loss per share was $(2.22) in FY26, against $0.41 and $0.39 of earnings in FY25.1
The debt is unusually cheap — leverage is not the constraint
The $6,745.7m of convertible notes carries roughly $59.5m of annual coupon — about 0.88% blended — and matures across 2029 to 2033, with the bulk in 2031 and later. Cash interest paid in FY26 was just $42.6m. The GPU facilities add about $56m a year on drawn amounts, at 5.96% fixed on the USPP notes and SOFR + 2.25% on the term loan, hedged with $1.5bn notional of swaps at roughly 3.80% fixed. Counting all cash, the company carries no net debt — $7.59bn of borrowings against $7.62bn of cash; counting only unrestricted cash it is about $1.70bn net debt.1
The cost is borne by shareholders instead. Shares outstanding went from 258.1m to 380.2m during FY26, and to 394.1m by 14 August 2026 — 53% dilution in roughly one year. The company also spent $1,623.5m of cash plus 39.7m shares to induce conversion of $544.3m of older notes, booking a $111.8m inducement expense.1
Costs are inflating faster than revenue
Selling, general and administrative: $136.5m → $449.1m (+229%), of which stock-based compensation alone went $42.6m → $205.0m
Depreciation and amortization: $181.1m → $417.7m, and rising sharply as the GPU fleet lands
Accounts payable and accrued expenses grew $1.68bn, a working-capital source that supports the year-end cash position1
11 / Record
Six years: one profitable, four flagged by auditors
Context for the FY26 loss. This is not a company with a long record of compounding earnings — it is a company whose audit opinion carried going-concern language in four of its six public years, before one profitable year and the pivot recorded above.1141516
Revenue against net income, FY2021–FY2026
US$ millions · IFRS through FY2023, US GAAP from FY2024 · fiscal year ends 30 June
Total revenueNet income (loss)
Full series, with the auditor's flag for each year1141516
Fiscal year
Revenue
Net income (loss)
Adj. EBITDA
Audit report
FY2021
7.9
(60.4)
1.4
Going concern
FY2022
59.0
(419.8)
26.2
Going concern
FY2023
75.5
(171.9)
1.4
Going concern; NYDIG receivership
FY2024
187.2
(28.9)
—
Going concern; material weakness
FY2025
501.0
86.9
269.7
Clean
FY2026
707.0
(702.6)
245.7
Clean
Cumulative
1,537.6
(1,296.7)
—
accumulated deficit $1,298.8m
The cumulative net loss of $1,296.7m reconciles to the $1,298.8m accumulated deficit on the FY26 balance sheet — the series is complete. FY2025 is the only profitable year in the company's public life, and even that was helped by unrealized gains on financial instruments.1
The going-concern language is the same language, four times
Armanino LLP's audit report covering FY2020, FY2021 and FY2022 carried a Going Concern Uncertainty paragraph: "significant uncertainties exist about the Group's ability to generate positive free cash flow and raise sufficient capital to fund outstanding purchase commitments." Raymond Chabot Grant Thornton repeated substantively the same finding in its FY2023 opinion, citing the $172m net loss, and again for FY2024, citing the $29.6m net loss — each time naming the same inability to fund outstanding purchase commitments. FY2023 was also the year two subsidiaries were in receivership.11141516
That phrase — funding outstanding purchase commitments — is precisely the pressure point today, at a scale 37 times larger. FY2025 and FY2026 opinions are clean and the balance sheet is vastly stronger, so this is history rather than a current qualification. But it establishes that the failure mode is not hypothetical: the company's auditors raised it in four consecutive years, FY2021 through FY2024, before the FY2025 opinion came in clean.114
12 / Exposure
Litigation, tax and audit history
NYDIG receivership — settled
In February 2023 PricewaterhouseCoopers was appointed receiver to two IREN non-recourse SPVs at the instance of lender NYDIG, spawning parallel proceedings in the Supreme Court of British Columbia, the BC Court of Appeal and the Federal Court of Australia. The BC Supreme Court initially declared certain hashpower transactions fraudulent conveyances; the Court of Appeal set that declaration aside in June 2024 while upholding dismissal of NYDIG's substantive consolidation claim. All claims were resolved by a settlement agreement dated 12 August 2025 under which IREN paid $20 million. The Canadian receivership concluded September 2025, the Australian recognition proceedings terminated October 2025, and the Canadian bankruptcy proceedings concluded on 24 December 2025.1
Securities class action — dismissed, on appeal
A putative class action filed 14 December 2022 in the District of New Jersey alleged misstatements in the IPO registration statement and in the period to 1 November 2022. After two rounds of amendment, the court granted IREN's motion to dismiss in full and with prejudice on 18 February 2026. The lead plaintiffs noticed an appeal to the Third Circuit on 13 March 2026; briefing has not yet been scheduled.1
Canada Revenue Agency — open
IREN filed a Notice of Appeal in the Tax Court of Canada on 23 June 2025 disputing the CRA's determination that the company has a permanent establishment in Canada, and the related GST assessment. The Crown replied in November 2025. No hearing timetable is set.1
Audit trail
Raymond Chabot Grant Thornton served from May 2023 until dismissal on 26 November 2025, replaced by KPMG LLP the following day. There were no disagreements — but RCGT's FY2024 report carried a going-concern explanatory paragraph, and RCGT reported a material weakness in internal control over financial reporting disclosed in the FY2024 Form 20-F. Both are historical; the FY2026 10-K reports management's assessment with auditor attestation under Section 404(b).11114
13 / Gaps
What this file does not establish
Stated plainly, so nobody mistakes an absence of data for an absence of risk. Each item below is a real limit on the analysis above.
FY2026 proxy not yet filedDue by late October 2026All compensation and ownership figures here are from the FY2025 proxy, dated 31 August 2025 — a year before the current share count. FY2026 named-officer pay, updated beneficial ownership, and the audited grant-date fair value of the June 2026 RSU grants are not yet public.5
Per-tranche Microsoft economicsRedactedGPU quantities per tranche, individual tranche values, delivery dates and the price per GPU-hour are all withheld as immaterial or commercially sensitive. The aggregate is verifiable; the unit economics are not.7
Customer concentration is not quantifiedNot disclosedThe 10-K states repeatedly that customer contracts "are concentrated" and names it a principal risk, but discloses no percentage of revenue or receivables by customer. The concentration can be inferred from contract values; it cannot be measured from the accounts.1
Three executives have no filed biographyNot Section 16 officersDavid Shaw (COO), Denis Skrinnikoff (CTO) and Cesilia Kim (CLO) appear on the company's leadership page but file no Section 16 reports and have no proxy biography. Appointment dates and backgrounds for them are absent from this file by choice rather than oversight.19
The 85% tax abatement figureNot in any filingIREN confirms property tax abatements and sales and use tax exemptions, in Texas among other places, sometimes in exchange for payments in lieu. It never quantifies them. Any specific percentage would come from a county-level abatement agreement, not from the SEC record.1
Who owns Emerald ProjectCo Inc.Officer and address on the record; shareholder notThe certified Oklahoma qualification names Will Roberts as President and Jason Date as Secretary and gives IREN's Childress campus as the principal place of business, so the connection to IREN is documented. Who holds the 1,000 shares is not on any record read, and Jason Date does not appear in IREN's filings. The Secretary of State was named as registered agent on the qualification form itself; Corporation Service Company replaced it on 30 July 2026. A name search for "IREN" in an aggregator snapshot of the Oklahoma register, marked partial for that state, returns one inactive foreign corporation, IREN Two, Inc. (filing 2300325032), and nothing ties it to IREN Limited. The Delaware and British Columbia entities that share the IE US and IE CA naming pattern but are absent from Exhibit 21.1 are name matches only.2122
Share price and market capitalisationPoint observations onlyThe only ordinary share prices in this file come from filed documents: $33.131 on 11 September 2025 and $36.32 on 16 September 2025, plus an aggregate non-affiliate market value of about $11.9bn at 31 December 2025. The $23.51 and $25.49 September figures are option disposal prices, not share prices. This file carries no live market data.131
Site-level capital cost and returnsNot disclosedCapital expenditure, power cost and contracted revenue are reported group-wide. Nothing in the filings allows a per-site or per-megawatt return to be calculated independently of management's own summary figures.1
Sweetwater 1 energisationUnconfirmedSubstation energisation was targeted for April 2026. The FY26 10-K, filed four months later, does not state whether that milestone was met. Treat the construction timeline as management guidance, not established fact.14
Headcount by geography and functionNot disclosed685 employees at 30 June 2026 plus roughly 580 from Mirantis and about 3,000 contractor personnel across US sites — but no split by country, site or function, and no attrition data.1
Post-30 June 2026 eventsOutside the reporting periodThe Mirantis close, the Horizon 1 acceptance, the July contract signings and the frontier-lab contract all fall after the balance sheet date. They are disclosed but not yet reflected in any audited figure in this file.14
14 / References
Every source, and what it supports
23 documents · all primary unless noted
Numbered markers throughout this file link here. Every figure is traceable to a filed document or a company disclosure; nothing is drawn from analyst estimates, market data feeds or secondary reporting except where reference 20 is cited; reference 21 is a state registry record read through an aggregator's snapshot, and 23 is read through the province's own OrgBook service.
[1]
Annual Report on Form 10-K, fiscal year ended 30 June 2026
Business and strategy; site portfolio and Item 2 Properties; employees; MD&A and liquidity; contractual commitments; legal proceedings; full audited financial statements and Notes 4, 14, 15, 19, 20, 22, 23, 26, 27 and 28.
B Class share voting rights (15 votes per Ordinary share held), dividend exclusion and redemption triggers; constitution provisions on director appointment and the 75% special-resolution threshold.
Filed 27 Aug 2026 · accession 0001878848-26-000051
Quarterly revenue split; contracted and operating ARR; pricing per MW of IT load, the “~2 year payback” and the footnote that defines it; prepayment percentages; the Blue Owl and PIMCO financing; delivery targets for 2026 and 2027.
Definitive Proxy Statement (DEF 14A) for the 2025 Annual General Meeting
Filed 6 Oct 2025 · accession 0001140361-25-037383
Director biographies, ages, appointment dates, committee composition and independence; beneficial ownership as at 31 Aug 2025; Summary Compensation Table; director compensation; equity compensation plan information.
Exhibit 10.3 — Microsoft Partner Statement of Work
Filed with [6], 5 Feb 2026 · executed 31 Oct – 2 Nov 2025
The executed contract. Signatures of Scott Guthrie for Microsoft and Kent Draper and William Roberts for IE US Hardware 3 Inc.; Section 3.2 total contract value cap; Table 1 aggregate tranche value, upfront payment and estimated monthly payments; Horizon 1–4 locations; NVIDIA GB300 specification; Service End Dates in 2031.
Form 8-K — Microsoft and Dell commercial agreements
Filed 3 Nov 2025 · accession 0001140361-25-040072
Announcement of the ~$9.7bn Microsoft total contract value, the 20% per-tranche prepayment mechanism, the 200MW combined IT load, and the ~$5.8bn Dell Purchase Agreement with IREN Limited's unconditional parent guarantee.
Filed 24 Nov 2025 · accession 0001140361-25-043142
Constitution amendments including annual director elections and the forum selection provision; approval of the 2025 Omnibus Incentive Plan and the full vote tallies.
The 9,099,328 RSUs granted to each Co-CEO on 30 June 2026; four-year vesting with a two-year post-vesting holding period; no further equity grant until fiscal 2031.
Filed 28 Nov 2025 · accession 0001140361-25-043599
Dismissal of Raymond Chabot Grant Thornton and appointment of KPMG LLP; confirmation that the FY2024 audit report carried a going-concern explanatory paragraph and that a material weakness was reported in the FY2024 Form 20-F.
Section 16 filings — Forms 3, 4 and 144, 2024–2026
29 ownership filings by IREN insiders over 2024–2026 — 26 Forms 3 and 4 plus three Forms 144; EDGAR also carries five Forms 144 from 2023
Officer and director filing addresses (all c/o Sydney); the September 2025 Co-CEO share sales with dates, volumes and prices; the July 2025 and July 2026 grants; the director sale of 11,958 shares at $36.32 on 16 September 2025, reported in a Form 4 filed 1 July 2026 (accession 0000950103-26-009962).
FY2023 and FY2022 revenue, loss after income tax and Adjusted EBITDA on an IFRS basis; substantial-doubt risk factor during the NYDIG receivership; Armanino LLP audit report covering FY2020–FY2022.
The institutional holder list and each filer's principal address: Goldman Sachs, Bank of America, Susquehanna, Jane Street, Citadel Securities, HANSAINVEST, and the Everest Hill Group 13D.
IREN corporate website — data centres, board and leadership pages
Retrieved 2 Sep 2026
Site status labels (operating, under construction, in development, planned); the current executive roster including officers who are not Section 16 filers.
Delaware Division of Corporations — entity records for Emerald ProjectCo Inc. (file 10276559) and the five Delaware subsidiaries in Exhibit 21.1 (files 6066236, 6401015, 6579372, 6666496 and 10520910), and a name search for "IE US"
Read through the GovFiles registry snapshot, dated 29 Jun – 26 Jul 2026 · retrieved 4 Sep 2026 · the Division's own search is the authority
Emerald ProjectCo Inc.'s incorporation on 29 July 2025, its file number, entity type, registered agent and registered address; the same fields for each Delaware subsidiary in Exhibit 21.1; the eighteen entities a name search for "IE US" returns and their formation dates; the absence of any officer, shareholder or parent in every record.
Oklahoma Secretary of State — the certified record for Emerald ProjectCo Inc., filing 2313901183
Certified copies and certificates issued 4 Sep 2026 under order 78346070003, published in full on the comparison page · the live entity record read the same day · the IREN Two, Inc. hit (filing 2300325032) is from the GovFiles registry snapshot dated 23 Jun 2026, which the aggregator marks as partial for Oklahoma
The Certificate of Qualification of 16 December 2025 (document 74120930002): principal place of business at 620 FM 1033, Childress, Texas; the stated Oklahoma business; assets of $21,100 and liabilities of $1,000; 1,000 common shares at $0.01 par and $10 of authorised capital; $187,000,000 declared as the maximum investment in Oklahoma for the fiscal year; the Secretary of State named as registered agent; the signatures of Will Roberts, President, and Jason Date, Secretary; the attached Delaware Certificate of Good Standing of 2 December 2025. The Appointment of Registered Agent of 30 July 2026 (document 77756320002), signed William Roberts. The certificates of 4 September 2026.
BC Registries — company records for IE CA 5 Holdings Ltd. (BC1310638) and IE CA Leasing Ltd. (BC1446682), via OrgBook BC
The Province of British Columbia's public registry service · retrieved 4 Sep 2026
Registration numbers, registration dates (16 June 2021 and 27 October 2023) and active status of the two British Columbia subsidiaries in Exhibit 21.1; IE CA Development Holdings 5 Ltd. (BC1307619, 28 May 2021) as a name-pattern neighbour absent from the exhibit.